Source of record · Version 5 workbook · selected public baselines reviewed September 10, 2026
Layer 01 of 08Read the place
Workbook baselineCurrent inventory needed
Layer 01 · Begin with what is already here
A city is not a blank sheet of paper.
San Angelo already has industrial land, freight access, education partners, and a community layer that includes its river, downtown, housing, schools, public safety, and opportunity. Stratigraphic work begins by reading those assets together.
Gateway's historical footprint is 746.7 acres; Section 2 adds more than 200 acres, while current parcel inventory and control still require confirmation.
Rail Port's original 180-acre tract provides a rail-access option; a reported expansion transaction requires confirmation.
Infrastructure, workforce, education, real estate, and community investment are treated as connected workstreams—not isolated projects.
Source of recordStudy 001 Overview · Industrial Site Screen · NE Corridor Assembly
What becomes possible when the pieces are treated as one system?
Stratigraphic helps communities and developers turn project spending into opportunities for permanent employers. We map what projects will buy, identify suppliers that could do part of that work locally, and test whether industrial sites, utilities, freight and workforce can support the operation.
Study 001 identified five prospects from its existing manufacturer research. Powell is the lead assembly prospect. The local facility ideas below are independent recruitment concepts. The cited company announcements describe activity in other locations.
Powell Industries
Satellite assembly. Fabricate, wire and stage e-houses and power control rooms at Gateway. Add factory testing if the site and operation qualify.
Powell reported Houston and Ohio capacity additions and is evaluating additional greenfield capacity.
What to verify. A transferable work package, repeat volume, test power and a verified heavy-haul route.
What San Angelo could ask of a data center developer
Bring the people who control equipment buying into the discussion. Share a phased procurement outlook, identify one unawarded equipment or service package, and commit to a supplier qualification meeting with the buyer and its engineering and construction team.
Start with a package such as e-house integration, switchgear staging, or cooling commissioning. Ask for specifications, qualification requirements, delivery dates, and estimated volume. If a qualified supplier can meet those requirements, explore a paid pilot and a conditional purchase or service agreement that supports local hiring and training.
Stratigraphic can assemble the site and workforce evidence, compare delivered cost and schedule, and document any agreed commitments. Gateway is the first site to screen. Parcel availability, utility capacity and heavy-haul routes require written verification. A larger factory would depend on recurring work from multiple buyers or phases.
Research Behind the Plan
Here is what Study 001 examined, how it informed the San Angelo concept, and what still needs verification.
The study compared the Business & Industrial Park and the Rail Port across land use, freight access, utilities and building needs.
What this means for the plan. The Rail Port is a candidate for heavy fabrication. Confirm rail spur costs, oversized-load access and parcel utilities before recommending a location.
The city markets utilities at the industrial park and publishes separate information on proposed data centers and large industrial water use.
What this means for the plan. Carry power, water and sewer capacity as open items until service providers confirm available capacity, upgrades, cost and timing for the proposed use.
The workbook’s regional demand screen identified switchgear, transformers and controls as equipment families to explore. The workforce inventory looked at electricians, machinery mechanics, machinists, welders and CNC operators.
What this means for the plan. Interview controls and electrical equipment firms about customers, jobs, facilities and training before promising a recruitment fit. The employment baseline describes filled jobs.
The economic model compared a data center alone, a data center plus one manufacturer, and a manufacturing district at 10, 20 and 25 years.
What this means for the plan. Use the scenarios to ask how operating jobs, payroll and local spending change with follow-on employers. Results depend on the assumptions and employer participation.